TTC Service resumes after massive delays along Line 1
Service has resumed on the TTC’s Line one after a two hour disruption caused by an electrical fire on Monday afternoon.
An investigation is underway into how grout and water coming from the construction on the Eglinton-Crosstown LRT was able to leak into the tunnel at Eglinton station just after 11 a.m.
The muddy mixture caused sparking and a small electrical fire on the tracks. The leak was sealed and the clean-up has concluded.
Advertisement
Toronto Fire was called in and shuttle buses were running between St. Clair and Lawrence stations during the delay.
Full service resumed around 1:30 p.m.